9455 Noble Way, Arvada CO 80007  ssquire@scs-construction.com  Office: 303.431.4429 Cell: 303.668.4302

CASE STUDY:

Starbucks

4205 West Colfax Avenue - Denver, CO

Job Type: Tenant Finish

Client:  Sloan’s Lake Coffee, LLC

Year: 2016

Key Features: In a new strip mall, this was the first tenant unit to be built out. With this being a new buildout, very few surprises were encountered. As GC, we coordinated with Starbucks to install the owner-provided flooring, tile and wallcovering, and coordinated with the signage and fixture installers that contracted Starbucks had contracted directly. All mechanical, plumbing and electric were our responsibility, as the building was core/shell only.

Back to main Case Studies page